Suche
 
Folgen Sie uns auf:

Mirabela Nickel Limited - Significant Increase in Santa Rita Open-Pit Resources

19.10.2012  |  CNW

PERTH, Australia, Oct. 19, 2012 /CNW/ - Mirabela Nickel Limited ("Mirabela" or the "Company") (ASX: MBN, TSX: MNB) is pleased to announce a significant increase in Resources after the successful open pit extension drilling program which was completed during the second quarter.

The revised remaining Resources as at the 30th September 2012 increased to 204.0 Mt @ 0.49% nickel (Measured, Indicated) and 79.6 Mt @ 0.56% nickel (Inferred), as presented in the table below.  The current mine life of 22 years is based solely on the previously stated Reserves of 159.0 Mt @ 0.52% nickel and 0.14% copper as at the end of December 2010 and a mine rate of 7.2 Mtpa of ore.

Santa Rita Deposit
Resources Table - Remaining as of the End of September 2012
PitClassificationtonnes
(million)
Nickel
grade (%)
Copper grade
(%)
Open Pit1, 2Measured16.00.500.10
 Indicated188.00.490.13
 Sub Total204.00.490.12
Open Pit1, 2Inferred79.60.560.15
Underground3, 4Inferred77.00.780.22
     
1 Based on a cut-off grade of 0.13% recoverable nickel.
2 Remaining as of end of September, 2012.
3 Based on a average cut-off grade of 0.50% nickel.
4 As of February 2009, re-reported using revised base of pit in October 2012.


The completion of the latest resource update is based on recent deeper drilling under the northern zone of Santa Rita, (14 holes for 9,540 metres); a re-interpretation of geology and structure for the entire deposit; and use of Ordinary Kriging for the Block Model, (with no Change of Support applied). The largest increases occurred in the Indicated and Inferred classifications where Resources increased approximately 32 Mt and 54 Mt respectively.  The Underground Inferred Resources decreased by approximately 10 Mt due to some of the Underground Inferred Resource being included within the updated pit shell.

The additional drilling brings the total amount of resource drilling specifically for Santa Rita to 675 holes for 190,660 metres.

Ian Purdy, CEO and Managing Director, said "This is an excellent result for Mirabela and reinforces the strategic significance of the Santa Rita operation on a global scale.  The increase in Resources provides an excellent platform for the next stage of our operational expansion studies which are currently ongoing".

Competent Persons

The information in this report that relates to the updated October 2012 Mineral Resources for the Santa Rita Nickel Deposit is based on information compiled by Mr. Lauritz Barnes and reviewed by Mr. Doug Corley.

Mr Barnes is a Member of the Australian Institute of Geoscientists, and is a Consultant to Mirabela Nickel Limited.

Mr Corley is a Member of the Australian Institute of Geoscientists and is a Registered Professional Geoscientist in the field of Mining (Registration Number 10109), and is employed as a Principal Resource Consultant with Coffey Mining Pty Limited.

Messrs Barnes and Corley qualify as both a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code) and as a Qualified Person in accordance with NI 43‐101. Each is independent of Mirabela Nickel Limited within the meaning of NI 43-101. Messrs Barnes and Corley have verified the data underlying the disclosures in this announcement. Messrs Barnes and Corley approve and consent to the inclusion in the presentation of the matters and defined Resources information based on their information in the form and context in which it appears.

Appendix 1:  Assessment and Reporting Criteria Tables

The following table provides a summary of important criteria related to the assessment and reporting of the Santa Rita Mineral Resources as presented in Table 1 of the Australian code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2004).

CriteriaExplanation
Sampling Techniques and Data
Drilling TechniquesAll 675 drillholes used in the Santa Rita resource interpretation are
Diamond (predominantly NQ with some HQ and PQ) drillholes for
190,660.3m.
Drill sample RecoveryDiamond core recovery within the ore averaged 97.6%, with 98.9% of
samples having a sample recovery greater than 80%.
LoggingDiamond core was logged into a validated Excel spread sheet logging
system and imported into industry standard drillhole database
management software.
All core was photographed, logged, cut, sampled and is stored at
Mirabela's exploration office and core shed in Ipiau, Bahia State, Brazil
(within 5 km of the Santa Rita mine).
Sampling techniques
and preparation
Core is oriented along the bottom of the hole. All samples were taken
as half core using a diamond core saw.
Quality of assay data
and laboratory tests
Quality control for all drilling was carried out involving certified
reference standards, field and coarse crush duplicates and blank
samples to monitor the accuracy and precision of the laboratory data.
Samples were prepared and ALS Global's facility in Belo Horizonte,
Minas Gerais State, Brazil.  Analyses were determined using 4 Acid
digest ICP Atomic Emission Spectrometry by ALS Global's ISO
9001:2000 accredited laboratories in Vancouver (Canada), Perth
(Australia) and Lima (Peru).  All samples returning nickel grades greater
than 0.6% from the ICP-AES method were re-analysed using ALS's
specific ore grade method.  Platinum, palladium and gold grades were
determined by 30g Fire Assay with ICP-MS finish by ALS in Vancouver,
Perth and Lima.
Verification of
sampling and assaying
Umpire assay checks were also completed by ACME Analytical
Laboratory Ltd (ISO 9001:2000 accredited) in Vancouver, Canada, and
Ultra Trace Analytical Laboratories (ISO 17025 accredited), in Perth,
Australia.
Location of Data
Points
All diamond drillholes have been located by DGPS with a horizontal
accuracy of +/-0.5m and a vertical accuracy of +/-1m, and subsequently
surveyed by contract and/or Mirabela surveyors.
All holes had magnetic downhole surveys taken initially at 10m
downhole - and then at approximately 30m intervals. For quality
control purposes, approximately 100 holes were also surveyed post-
drilling by Downhole Surveys DHS Pty Ltd. using a north-seeking
gyroscope. The initial magnetic downhole surveys were checked
against the gyroscope results with all matching to acceptable standard.
Data Spacing and
distribution
Drilling has been completed on nominal east-west sections with 40-
60m spacing to support Indicated resource classification.  In areas, infill
has been completed to 20-25m spacing to support Measured resource
class and more open spacing 100-120m spacing in the deeper parts
supporting Inferred resources.
Data Spacing and
distribution
The vast majority of the drilling was angled to intersect perpendicular
to the trend of the geology and mineralised zone.  Roughly 10% of the
drillholes were drilled at other orientations for geotechnical,
metallurgical sampling or for testing geological and mineralisation
continuity.
Estimating and Reporting of  Mineral Resources
Construction of
geological, structural
and mineralisation
models
A 3-D model has been constructed using industry standard resource
modelling software.  Lithological contracts, faults, dolerite dykes and
the mineralised zone were all modelled into 3-D wireframes then used
to populate the block model and flag the mineralised zone composites
for use in the estimation process.
Estimation and
modelling techniques
Ordinary Kriging (OK) to the parent block size (20mE x 25mN x 5mRL)
was used to estimate Ni, Cu, Co, Pd, Pt, Au, Fe, Mg and S, based on 3m
composited drill hole grades. A recoverable Ni attribute (NiRec)
calculated for each composite using a regression equation established
from plant operating data was also estimated.
All data was transformed into "flattened space" where the OK estimate
was conducted.  The estimated blocks were then transformed back into
their original spatial location, for reporting purposes.
Three estimation passes were used for all elements with distance limits
of 40m, 80m and 160m consecutively.  A maximum of 24 samples and
minimum of 8 samples of which no more than 5 were from any one
hole was used for each pass. For all estimations a discretisation matrix
of 3x3x3 was used.
MoistureTonnes have been estimated on a dry basis.
Cut-off parametersMineral Resources have been reported using a recoverable nickel cut-
off of 0.13%. 
Mining factors or
assumptions
No mining assumptions have been built into the resource.
Metallurgical factors
or assumptions
No metallurgical factors or assumptions have been built into the
resource.
Bulk density16,726 core samples have been measured for density from the
drillholes used in the modelling and resource estimation.
The method used the air dried half core sample weighed in air and
then when immersed in water, the results of which were used to
estimate the density.
Samples were selected from the oxide zone through to the fresh zone
with wax coating methods applied where necessary to core samples to
ensure representative results.
ClassificationMineral Resources have been classified on the basis of confidence in
the geological and grade continuity using the drilling density, geological
model and pass in which the nickel was estimated.
Measured Resources have been defined generally in areas of 20m to
25m drill spacing and in Pass 1.
Indicated Resources have been defined generally in areas of 40m to
60m drill spacing and in Pass 2.
Inferred Mineral Resources have been defined generally in areas of
100m to 120m drill spacing and in Pass 3.
Block Model
Verification
Swath plots were generated along east-west and elevation sections
and the block grades compared well with the composite grades. Visual
3D comparisons were also completed with the estimated blocks and
composited drillhole data, to check that the continuity and grade was
reflected in the estimated blocks. 
Audits or reviewsA high level audit of the interpretation, compositing, top cuts,
estimation modelling parameters and classifications was carried out by
Coffey Mining. No matters were noted that would impair the validity of
the Mineral Resource Estimate.

 

 

SOURCE Mirabela Nickel Ltd.

Bill Bent, Chief Development Officer
Mirabela Nickel Limited
Telephone: +61 433 790 070
billb@mirabela.com.au


Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
Mirabela Nickel Ltd.
Bergbau
-
-
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"