EQS-News: Quarterly Activities Report for the period ending 30 September 2025

22.10.2025  |  DGAP

Quarterly Activities Report for the period ending 30 September 2025

During the period ending 30 September 2025 (the Quarter), Vulcan Energy (Vulcan, ASX: VUL, FSE: VUL, the Company) continued the strong momentum of the first half of 2025 by achieving significant commercial and operational progress in advancing the execution of the Phase One Lionheart Project (the Project).

The Project will have the capacity to produce 275 GWh of power, and 24,000 tonnes of LHM, enough for ca. 500,000 battery electric vehicles, per annum[1].

Highlights from the Quarter

Subsequent events

Managing Director and CEO, Cris Moreno, commented: "The September Quarter continued the strong momentum we have been steadily building over the past 12 months. Successes on project execution preparation were pleasing with the CLP permit now secured and approval to purchase the land at the site of our G-LEP granted. We also signed several major supply contracts, including those with NESI, and Turboden and ROM Technik, which is a credit to our team.

"The granting of the TCTF funding was another particular highlight of the Quarter. Attracting the support of German federal and state governments is important to the future success of the Project at a financial level but also demonstrates the Project's position in Germany and broader Europe's energy transition. It reflects the significance of our contribution to Europe's critical raw materials supply chain resilience.

"The remainder of the year is expected to be transformative for the Company, as we aim to finalise our financing package for Phase One, including execution of all remaining major supply contracts. We remain focused on delivering long-term value to our shareholders and look forward to providing further updates over the coming period."

Health and safety

Integrated renewable energy and lithium production


Renewable energy operations

Well site preparation and rig readiness


Figure 1: Schleidberg well site near Landau, Germany.


Lithium Extraction Optimisation Plant (LEOP)

Central Lithium Electrolysis Optimisation Plant (CLEOP)

Phase One project execution preparation

Commercial and financing


Future phase update
Ongoing discussions in relation to future phase licence regions continued throughout the reporting period in addition to the following:

Mannheim, Germany

Ludwigshafen, BASF joint project, Germany

Ortenau, Germany

Environmental, Social and Governance (ESG)

Climate risk assessment

Stakeholder engagement

Additional ASX Disclosure Information

ASX Listing Rule 5.3.1: Exploration and Evaluation expenditure during the Quarter was €0.1m.

ASX Listing Rule 5.3.2: Development expenditure during the Quarter was €17.7m. Expenditure predominately related to the Phase One area Schleidberg production wellsite drilling (€11.6m), preparatory works for the construction of the Central Lithium Plant (€1.9m) and Lithium Extraction Plant (€2.3m), and refurbishment costs for Vulcan's V10 electric drill rig (€0.7m).

ASX Listing Rule 5.3.3: During the Quarter, the Boccaleone licence expired and was not renewed. No licences were acquired during the Quarter. For further information see Table 1 below.

ASX Listing Rule 5.3.5: Payments to related parties of the Company and their associates during the Quarter per section 6.1 of the Appendix 5B amounted to €274,000. This is comprised of an allocation of the Managing Director remuneration of €54,000, Group Chief Financial Officer and Executive Director remuneration of €80,000, Executive Chair remuneration of €96,000 and Non-Executive Director fees of €43,000. Payments to related parties of the Company and their associates during the quarter per section 6.2 of Appendix 5B total €44,000. This amount is an allocation of the Managing Director's remuneration for work done on activities associated with Vulcan's Phase One Lionheart Project. Please see the Remuneration Report in the 2024 Annual Report for further details on Directors' Remuneration.


Table 1: Vulcan's integrated lithium and renewable energy project licence table[5]

NAME STATE RESOURCES APPLIED FOR AREA (KM²) EXPIRY OWNERSHIP AS AT 30 SEPTEMBER 2025 CHANGE IN OWNERSHIP TYPE
Rift-Nord RLP Geothermal & lithium 61,83 (VER share), 149.74 km² total 6.2027 50 % VER GmbH, 50 % GET, Vulcan has rights to develop production projects with 100% ownership in the licence area N/A exploration
Landau-Süd RLP Geothermal 19.41 5.2034 100 % VER GmbH N/A production
Ilka RLP Lithium 11.2025 100 % VER GmbH N/A exploration
Insheim RLP Geothermal 19 11.2037 100% Natürlich Insheim GmbH N/A production
LiThermEx RLP Lithium 3.2027 100% VER GmbH N/A exploration
Ried Hessen Geothermal, brine & lithium 289.92 7.2027 100 % VER GmbH N/A exploration
Luftbrücke Hessen Geothermal, brine & lithium 207.25 9.2026 100 % VER GmbH N/A exploration
Waldnerturm BW Geothermal, brine & lithium 20.43 12.2026 100 % VER GmbH N/A exploration
Lampertheim II Hessen Geothermal, brine & lithium 1.99 7.2026 100 % VER GmbH N/A exploration
Ortenau BW Geothermal, brine & lithium 374.1 12.2025 100 % VER GmbH N/A exploration
Mannheim BW Geothermal, brine & lithium 144.49 6.2027 100 % VER Pty Ltd N/A exploration
Taro RLP Geothermal 32.68 9.2027 100% VER GmbH N/A exploration
Lisbeth RLP Lithium 9.2027 100 % VER GmbH N/A exploration
Ludwig RLP Geothermal & lithium 96.34 12.2027 100 % VER GmbH N/A exploration
Therese RLP Geothermal & lithium 81.12 12.2027 100 % VER GmbH N/A exploration
Lampertheim Hessen Geothermal, brine & lithium 108.03 7.2026 100 % VER GmbH N/A exploration
Kerner RLP Geothermal & lithium 72.26 12.2027 100 % VER GmbH N/A exploration
Löwenherz RLP Geothermal & lithium 75.43 12.2026 100 % VER GmbH N/A exploration
Flaggenturm 2023 RLP Geothermal 166.75 12.2027 100 % VER GmbH N/A exploration
Fuchsmantel 2023 RLP Lithium 12.2027 100 % VER GmbH N/A exploration
Darmstadt-West Hessen Brine & lithium 163,09 6.2027 100 % VER GmbH N/A exploration
Kachelhoffa FR Geothermal 463.34 7.2029 100% Vulcan Énergie France N/A exploration
Kachelhoffa minéral FR Lithium 7.2029 100 % Vulcan Énergie France N/A exploration
Cesano IT Geothermal & Lithium 11.46 01.2027 50% Vulcan Energy Italy Pty Ltd., 50 % Enel Green Power N/A exploration
Boccaleone[6] IT Geothermal & Lithium 4.31 N/A -100% N/A exploration

Mineral Resources and Ore Reserves

During the Quarter, Vulcan's total lithium brine Resource (Indicated and Inferred) for the Mannheim sector increased to 3,225kt LCE @155 mg/Li[7]. For further information please see Table 2 below, the Company's ASX announcement of 9 July 2025 and the Competent Person Statement in this report.

Vulcan's Mineral Reserve estimates did not change during the Quarter.

Vulcan also announced a large-scale, in place maiden geothermal Resource of 2,848 PJ (Indicated) and 10,539 PJ (Inferred) estimate for the Mannheim sector of which 171 PJ (Indicated) and 377 PJ (Inferred) are considered recoverable.

Table 2: Vulcan's combined Mineral Resource Estimates table
Vulcan's combined Upper Rhine Valley Project Lithium Brine Measures, Indicated and Inferred Mineral Resources estimates, as at the date of this Report, are set out in the following table.

Licence/Area Reservoir Classification GRV km3 Avg. NTG (%) Avg. Phie (%) Avg.Li mg/L Elemental Li (t) LCE (kt)
Insheim *MUS, BST, ROT,BM Measured 13 69 9 181 151,823 808
Rift-North *MUS, BST, ROT,BM Measured 9.5 70 9 181 110,181 586
*MUS, BST, ROT,BM Indicated 29 71 9 181 355,443 1,892
Landau Sued *MUS, BST, ROT,BM Measured 12 68 9 181 134,677 717
*MUS, BST, ROT,BM Indicated 2.7 69 9 181 29,620 158
Flaggenturm BST Indicated 7 90 10 181 115,215 613
BST Inferred 37 65 9 181 391,201 2,082
Kerner BST Indicated 5 90 10 181 76,242 406
BST Inferred 13 65 9 181 132,558 705
Kerner Ost *MUS, BST, ROT Indicated 4.3 73 8 181 66,708 355
Taro *MUS, BST, ROT Indicated 15 73 8 181 237,362 1,263
Ortenau *MUS, BST, ROT Indicated 57 73 8 181 659,013 3,507
BST Inferred 105 73 8 181 1,883,212 10,024
Mannheim BST Indicated 11 90 10 155 154,000 820
MUS, BST, BM Inferred 41 83 8 155 452,000 2,405
Ludwig BST Indicated 7 90 10 153 93,220 496
BST Inferred 22 65 9 153 199,226 1,060
Therese BST Indicated 2 90 10 153 29,907 159
BST Inferred 22 65 9 153 220,708 1,068
Mg/L kt
Total LCE Measured 181 2,112
Indicated 177 9,669
Inferred 174 17,344
Total 29,124

Note 1: Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. Refer to the Competent Person Statement in this Report for further information.

Note 2: The weights are reported in metric tonnes (1,000 kg or 2,204.6 lbs). Numbers may not add up due to rounding of the resource value percentages.

Note 3: Reservoir abbreviations: MUS - Muschelkalk Formation, BST - Buntsandstein Group; ROT Rotliegend Group; BM - Variscan Basement.

Note 4: To describe the resource in terms of industry standard, a conversion factor of 5.323 is used to convert elemental Li to Li2CO3, or Lithium Carbonate Equivalent (LCE).

Note 5: NTG and Phie averages have been weighted to the thickness of the reservoir.

Note 6: GRV refers to gross rock volume, also known as the aquifer volume.

Note 7: Mineral Resources are considered to have reasonable prospects for eventual economic extraction under current and forecast lithium market pricing with application of Vulcan's A-DLE processing.

Note 8: The values shown are an approximation and with globalised rounding of values in the presented summary table as per JORC guidelines, cannot be multiplied through to achieve the Mineral Resource estimated volumes shown above.

For and on behalf of the Board

Daniel Tydde | Company Secretary

Media

Judith Buchan, Communications Lead APAC | jbuchan@v-er.eu | +61 411 597 326

Please contact Vulcan's Legal Counsel Germany, Dr Meinhard Grodde, for matters relating to the Frankfurt Stock Exchange listing on mgrodde@v-er.eu

About Vulcan Energy

Vulcan Energy (ASX: VUL, FSE: VUL) is building the world's first carbon neutral, integrated lithium and renewable energy business to decarbonise battery production. Vulcan's Lionheart Project, located in the Upper Rhine Valley Brine Field bordering Germany and France, is the largest lithium resource in Europe[8] and a tier-one lithium project globally. Harnessing natural heat to produce lithium from sub-surface brines and to power conversion to battery grade material and using its in-house industry-leading technology VULSORB®, Vulcan is building a local, low-cost source of sustainable lithium for European electric vehicle batteries. For more information, please go to https://v-er.eu/


Disclaimer

Some of the statements appearing in this announcement may be in the nature of forward-looking statements. You should be aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and uncertainties include factors and risks specific to the industries in which Vulcan operates and proposes to operate as well as general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among other things. Actual events or results may differ materially from the events or results expressed or implied in any forward-looking statement. No forward-looking statement is a guarantee or representation as to future performance or any other future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many of which will be outside Vulcan's control.

Vulcan does not undertake any obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions or conclusions contained in this announcement. To the maximum extent permitted by law, none of Vulcan, its Directors, employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information contained in this announcement. You are cautioned not to place undue reliance on any forward-looking statement. The forward-looking statements in this announcement reflect views held only as at the date of this announcement.

This announcement is not an offer, invitation or recommendation to subscribe for, or purchase securities by Vulcan. Nor does this announcement constitute investment or financial product advice (nor tax, accounting or legal advice) and is not intended to be used for the basis of making an investment decision. Investors should obtain their own advice before making any investment decision.


Competent Person Statement

The information in this announcement that relates to estimates of Mineral Resources and Ore Reserves is extracted from the Bridging Engineering Study Results announcement on 16 November 2023 and the Future Phase Pipeline - Mannheim Resources Growth announcement on 9 July 2025[9], both of which are available to view on Vulcan's website at http://v-er.eu. Vulcan confirms, that in respect of the estimates of Mineral Resources and Ore Reserves included in this announcement:

  1. it is not aware of any new information or data that materially affects the information included in the original market announcement, and that all material assumptions and technical parameters underpinning the estimates in the original market announcement continue to apply and have not materially changed; and
  2. the form and context in which the Competent Persons' findings are presented in this announcement have not been materially modified from the original market announcement.

The information in this announcement that relates to production targets (and the forecast financial information derived from such production targets) is extracted from the End of Validation review contained in the Prospectus released on 18 December 2024 which is available to view on Vulcan's website at http://v-er.eu. Vulcan confirms that all material assumptions underpinning the production targets (and the forecast financial information derived from such production targets) included in this announcement continue to apply and have not materially changed.

[1] Please refer to the risk factors contained in the 18 December 2024 (Prospectus) and Appendix 4 of the Equity Raise Presentation dated 11 December 2024 regarding the risks associated with resource exploration and development projects. Based on the Phase One production target capacity of 24ktpa from the Bridging Engineering Study (BES) Announcement 16 November 2023 and Vulcan internal estimated average EV battery size and chemistry in Europe. Please also refer to the Competent Person Statement.

[2] An average AUD/EUR exchange rate of 0.57 has been used in this report.

[3] The final amount is subject to Vulcan providing evidence of expenditure.

[4] 'Clean Lithium for Battery Cell Production' is referred to as 'Sauberes Lithium für die Batteriezellfertigung' in Germany.

[5] Vulcan's licences as at the date of this report, unless otherwise noted, with the licences of Phase One shaded in grey.

[6] The Boccaleone licence expired during the reporting period and was not renewed.

[7] This consists of the Indicated Resource increasing from 288kt LCE @ 153 mg/Li to 820kt LCE @ 155 mg/Li and the Inferred Resource increasing from 1,545kt LCE @ 153 mg/Li to 2,405kt LCE @ 155 mg/Li

[8] On a lithium carbonate equivalent (LCE) basis, according to public information, as estimated and reported in accordance with the JORC Code 2012. See Appendix 4 of Vulcan's Equity Raise Presentation dated 11 December 2024 for comparison information.

[9] The Mannheim Announcement relates solely to the lithium brine Resource estimation for the Mannheim sector.