Austin Gold Corp. reports the results of its annual general meeting of shareholders held on May 8, 2024 in Vancouver, British Columbia. A total of 7,006,582 shares were represented in person or by proxy at the meeting, being 52.79% of the issued and outstanding shares at the record date. A summary of the Meeting results is outlined below. Election [...]
Austin Gold announces that the Company has received gold assays for the third diamond drill hole at its Stockade Mountain Project. The third hole returned a high gold value of 9.32 g/t from a 2.7 foot interval of chalcedonic vein and breccia. Hydrothermal alteration and mineralization in the hole are exceptionally strong and the rock is completely [...]
Austin Gold announces that the Company has completed the third diamond drill hole at its Stockade Mountain Projectn. All core samples are at the assay laboratory and are in the process of being prepped and assayed, with results expected in four to six weeks. The initial two holes confirmed that the mineralizing system at Stockade Mountain is robust [...]
Austin Gold announces that the Company has received gold assay results from the first two drillholes at its Stockade Mountain Project. These holes confirm that the mineralizing system at Stockade Mountain is robust and contains significant gold grades, with the strongest intercept of 8.19 g/t over 1.2 m and several other gold intercepts of [...]
Austin Gold provides the following corporate update. As reported previously, the Company completed a drilling program on the Miller Project. Four holes totalling 2,001 m were drilled to target Carlin-type gold mineralization hypothesized to occur beneath Quaternary gravels and Tertiary volcanic rocks. The primary purpose of this drilling program [...]