Suche
 
Folgen Sie uns auf:

G2 Goldfields Appoints COO

06.10.2022  |  GlobeNewswire

TORONTO, Oct. 06, 2022 - G2 Goldfields Inc. ("G2" or the "Company") (TSXV: GTWO; OTCQX: GUYGF) is pleased to announce Mr. Torben Michalsen will be joining the Company as Chief Operating Officer commencing November 2022. Previously as Construction Manager at GCM Mining, Mr. Michalsen was responsible for developing the Toroparu Project, Guyana. During his tenure as Construction Superintendent at IAMGOLD (2018-2021), Mr. Michalsen led the design optimisation of Saramacca, Rosebel Gold Mines.

Mr. Michalsen is uniquely qualified and positioned for this role given his extensive experience in the Guiana Shield and in-depth knowledge of building key infrastructure for mining project operating across the region. Beyond complex logistical coordination, Mr. Michalsen is highly skilled in navigating supply chain management, procurement, feasibility assessments and implementing critical environmental studies.

Patrick Sheridan, Executive Chairman, commented, "We are delighted to welcome Torben to our management team in November. His expertise will be crucial in expediting the Company's various exploration campaigns at OKO and in the surrounding areas. His initial focus will be on streamlining logistics for airstrip and road construction."

About G2 Goldfields Inc.

The G2 Goldfields team is comprised of professionals who have been directly responsible for the discovery of millions of ounces of gold in Guyana as well as the financing and development of the Aurora Gold Mine, Guyana's largest gold mine. G2 recently announced its maiden mineral resource estimate on the newly discovered Oko property in Guyana (see press release dated April 25, 2022), and has recently filed on SEDAR an independent technical report entitled "NI 43-101 Technical Report and Mineral Resource Estimate for the Oko Gold Property, Cooperative Republic of Guyana, South America", with an effective date of April 14, 2022. Highlights of the report include:

  • 974,000 oz. Au - Inferred Mineral Resource contained within 3,274,000 tonnes @ 9.25 g/t Au; and
  • 220,000 oz. Au - Indicated Mineral Resource contained within 793,000 tonnes @ 8.63 g/t Au.

Significantly, all of the maiden mineral resources lie within 350 meters of surface and remain open down plunge. The Oko district has been a prolific alluvial goldfield since its initial discovery in the 1870's, and modern exploration techniques continue to reveal the considerable potential of the district.

For further information please contact:

Dan Noone
CEO
+1.416.628.5904
Email: news@g2goldfields.com

Forward Looking Statements

This news release contains certain forward-looking information and statements within the meaning of applicable securities laws. The use of any of the words "expect", "anticipate", "continue", "estimate", "may", "might", "will", "project", "should", "believe", "plans", "intends" and similar expressions are intended to identify forward-looking information and/or statements. Forward-looking statements and/or information are based on a number of material factors, expectations and/or assumptions of G2 Goldfields which have been used to develop such statements and/or information, but which may prove to be incorrect. Although G2 Goldfields believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements as G2 Goldfields can give no assurance that such expectations will prove to be correct. In addition to other factors and assumptions which may be identified herein assumptions have been made regarding, among other things: results from planned exploration and drilling activities; future plans for operational expenditures; the accuracy of the interpretations of exploration and drilling activity results; availability of financing to fund current and future plans and expenditures; the impact of increasing competition; the general stability of the economic and political environment in which G2 Goldfields has property interests; the general continuance of current industry conditions; aboriginal matters; the timely receipt of any required regulatory approvals; the ability of G2 Goldfields to obtain qualified staff, equipment and/or services in a timely and cost efficient manner; the ability of the operator of each project in which G2 Goldfields has property interests to operate in a safe, efficient and/or effective manner and to fulfill its respective obligations and current plans; future commodity prices; currency, exchange and/or interest rates; and the regulatory framework regarding royalties, taxes and/or environmental matters in the jurisdictions in which G2 Goldfields has property interests. The forward-looking information and statements included in this news release are not guarantees of future performance and should not be unduly relied upon. Such information and/or statements, including the assumptions made in respect thereof, involve known and unknown risks, uncertainties and other factors that may cause actual results and/or events to differ materially from those anticipated in such forward-looking information and/or statements including, without limitation: risks associated with the uncertainty of exploration results and estimates, currency fluctuations, the uncertainty of conducting operations under a foreign regime, exploration risk, the uncertainty of obtaining all applicable regulatory approvals, the availability of labour and/or equipment, the fluctuating prices of commodities, the availability of financing and dependence on the management personnel of the Corporation, other participants in the property areas and/or certain other risks detailed from time-to-time in G2 Goldfields public disclosure documents (including, without limitation, those risks identified in this news release and G2 Goldfields current management's discussion and analysis). Furthermore, the forward-looking statements contained in this news release are made as at the date of this news release and the Corporation does not undertake any obligations to publicly update and/or revise any of the included forward-looking statements, whether as a result of additional information, future events and/or otherwise, except as may be required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy and / or accuracy of this release.



Bewerten 
A A A
PDF Versenden Drucken

Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Quelle. Bei Übersetzungen können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffentlichung will dieser lediglich ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehren uns gegen jede Form von Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer!




Mineninfo
G2 Goldfields Inc.
Bergbau
A2PG3W
CA36256R1055
Minenprofile
Alle Angaben ohne Gewähr! Copyright © by GoldSeiten.de 1999-2024.
Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt!

"Wir weisen Sie ausdrücklich auf unser virtuelles Hausrecht hin!"